CRWD drone videos of flood-reduction projects after major rain in Sept. 2019
![dobbins 1 dexter twp south dobbins dobbins 1 dexter twp south dobbins](https://www.cedarriverwd.org/wp-content/uploads/2019/10/dobbins-1-dexter-twp-south-dobbins.png)
Dexter 30 project – Completed in 2019, this shows the berm slowing and treating stormwater Sept. 13, 2019, from 490 acres in Dexter Township in the headwaters of Dobbins Creek’s south branch, just north of Interstate 90.
![dobbins 1 kiser drone aerial dobbins 1 kiser drone aerial](https://www.cedarriverwd.org/wp-content/uploads/2019/10/dobbins-1-kiser-drone-aerial.png)
Dobbins 1 - This is the upstream berm capturing and slowly releasing stormwater Sept. 13, 2019, from 810 acres southeast of Brownsdale. This flows toward a downstream berm and then into Dobbins Creek's north branch.
![dobbin 1 both berms drone sept 13 2019 dobbin 1 both berms drone sept 13 2019](https://www.cedarriverwd.org/wp-content/uploads/2019/10/dobbin-1-both-berms-drone-sept-13-2019.png)
Dobbins 1 (both berms) - This video shows Dobbins 1's upstream and downstream berms both detaining and slowly releases stormwater from 810 acres southeast of Brownsdale before it flows into Dobbins Creek's north branch.
![250th st project drone video pic sept 13 2019 250th st project drone video pic sept 13 2019](https://www.cedarriverwd.org/wp-content/uploads/2019/10/250th-st-project-drone-video-pic-sept-13-2019-300x166.png)
250th St project - This shows a nearly complete flood berm detaining and slowly releases stormwater on the north side of 250th St, southeast of Brownsdale. About 470 acres drain into this site.